(TA SIPIL 21) ANALISIS METODE PERCEPATAN TIME COST TRADE-OFF DENGAN PRIMAVERA PROJECT PLANNER P6 (Studi Pada : Jembatan Kali Putih 2 Proyek Jalan Tol Semarang - Solo)

Collection Location Perpustakaan Fakultas Teknik
Edition
Call Number 24 DUT a 21
ISBN/ISSN
Author(s) Ir. Agus Bambang Siswanto, M. T.
Duta Wahyu Utomo
Ir. M. Afif Salim, S.T., M.T, M.M
Subject(s) RAB
Perbandingan Analisis
Time Cost Trade Off
Primavera Project Planner P6
Classification 24 DUT a 21
Series Title
GMD TA Teknik Sipil
Language Indonesia
Publisher Fakultas Teknik Untag Semarang
Publishing Year 2021
Publishing Place Semarang
Collation
Abstract/Notes
Specific Detail Info Npm : 181003222010961